Earthworks observation, testing and certification
Good earthworks set up everything that follows. Poorly placed fill can lead to settlement, cracked slabs and costly rework.
We specify, observe and test earthworks so platforms, pavements and lots perform as designed, and you have the records council needs.
When you need us
- Building platforms and cut-and-fill sites
- Subdivision bulk earthworks
- Engineered fill under slabs and pavements
- Removing or treating unsuitable ground
- Certifying fill for 224(c) or building consent
What's included
- Earthworks specifications and fill criteria
- Inspection of stripped and undercut areas
- Fill compaction testing (shear vane, Clegg hammer, Scala)
- Subgrade testing for pavements
- Earthworks completion reports and fill certification

Working with Auckland clays
Most Auckland fill is local clay, and it is very sensitive to moisture. Placed too wet, it will not reach the strength the specification needs. Placed in summer and left to dry, it can crack. Agreeing a realistic testing plan with your contractor before the first truck arrives saves arguments later.
Ground conditions by area: Albany & North Harbour, East Auckland
What we work to
Our advice follows current New Zealand standards and guidance, and what Auckland Council expects to see in a consent application.
- NZS 4431:2022 Engineered fill construction for lightweight structures
- NZS 4402 and NZGS shear vane guideline for field testing
- Auckland Council Code of Practice for Land Development and Subdivision, Chapter 2
From site address to signed-off report
Send us your plans and the site address
Architectural or scheme plans, and any existing reports.
Desk study
We review geology maps, the NZ Geotechnical Database, council records and historic aerials.
Proposal
A clear scope, fixed fee and programme before any work starts.
Site work and report
Fieldwork with minimal disruption, then clear findings and practical recommendations.
Ongoing support
We answer council RFIs and support you through design and construction.
Common questions
Why does fill need testing?
Testing confirms it was placed and compacted properly, so it won't settle under your building or pavement.
How often do you test?
It depends on the size and type of earthworks. We set a testing schedule in the specification and agree it with your contractor.
Can you certify fill that's already placed?
Sometimes. It may need a site investigation to confirm. Ideally, involve us before earthworks start.
Do you work with my contractor?
Yes. We coordinate site visits around their programme to avoid delays.

Starting earthworks? Get in touch early and we'll set up specifications and testing that keep your project moving.
You get a clear, fixed scope and fee up front. Prefer to talk? Call 09 218 6915 or email info@gibbritchie.co.nz.