Geotechnical construction monitoring
Ground conditions during construction don't always match the investigation. Timely inspections catch problems early and keep your build moving.
We inspect and test the geotechnical parts of your project and provide the sign-off council needs at completion.
When you need us
- Pile drilling and foundation excavations
- Retaining wall construction and drainage
- Earthworks and fill placement
- Subgrade preparation for slabs and pavements
- Unexpected ground conditions on site
What's included
- Foundation and pile inspections
- Retaining wall and drainage inspections
- Earthworks observation and compaction testing
- Site visit records and photo logs
- Advice when ground conditions change
- PS4 construction review statements

Book inspections early
The most common delay we see is a pile rig waiting for an inspection nobody booked. Tell us your programme when the contractor is appointed and we will plan visits around it.
Ground conditions by area: Central Auckland
What we work to
Our advice follows current New Zealand standards and guidance, and what Auckland Council expects to see in a consent application.
- Producer statements PS4 (construction review), as accepted by Auckland Council
- Auckland Council Producer Statement Author register
- NZS 4431:2022 for engineered fill
From site address to signed-off report
Send us your plans and the site address
Architectural or scheme plans, and any existing reports.
Desk study
We review geology maps, the NZ Geotechnical Database, council records and historic aerials.
Proposal
A clear scope, fixed fee and programme before any work starts.
Site work and report
Fieldwork with minimal disruption, then clear findings and practical recommendations.
Ongoing support
We answer council RFIs and support you through design and construction.
Common questions
What is a PS4?
A producer statement confirming that construction was reviewed and meets the design. Council usually needs one for the geotechnical work.
What if the ground isn't as expected?
We assess it on site and give practical advice so work can continue with minimal delay.
How much notice do you need?
Ideally 24 to 48 hours. We'll work around your contractor's programme.
Can you inspect if another firm did the design?
Often, yes, though we may need to review their design first. Get in touch to discuss.

Need a site inspection? Contact us with your site address and programme, and we'll book it in.
You get a clear, fixed scope and fee up front. Prefer to talk? Call 09 218 6915 or email info@gibbritchie.co.nz.