Why Early Geotechnical Input Saves Time and Cost in Land Development Projects
- Sam Gibb
- Sep 28
- 4 min read
When a new land development project kicks off, the pressure is usually on to get the design moving quickly. Civil engineers and surveyors are tasked with producing layouts, infrastructure designs, and consent documentation under tight timelines. In that rush, geotechnical input is sometimes seen as something that can wait until later in the process.
But in reality, bringing a geotechnical engineer in early can save developers and design teams significant time, money, and frustration. In this article, we’ll explain why early involvement matters, what can go wrong when it’s left too late, and how early ground information leads to smoother projects.

The Ground is the Foundation of Every Project
Every structure — whether it’s a subdivision, road, or retaining wall — ultimately depends on the ground it sits on. The soils and rock beneath a site aren’t visible when you walk across it, but they can make or break a project’s feasibility.
Soft or compressible soils can lead to settlement problems.
Uncontrolled fill can cause unpredictable performance.
Groundwater conditions can complicate excavations and stability.
Slope hazards can create safety and long-term performance risks.
These issues don’t just affect geotechnical design; they flow directly into earthworks volumes, foundation requirements, drainage layouts, and even whether a site is viable for development.
Common Problems When Geotechnical Input Comes Too Late
We often see projects where geotechnical input is delayed until after preliminary designs are prepared. This creates several challenges:
Design Revisions – If ground conditions don’t align with assumptions, road grades, retaining wall locations, or foundation designs may need rework.
Cost Blowouts – Changes late in the process can mean more expensive designs or unexpected construction challenges.
Delays in Consenting – Councils often require geotechnical information upfront. Submitting without it can trigger requests for further information (RFIs), slowing down approvals.
Construction Risks – If problems are only discovered on site, contractors face uncertainty, variations, and programme delays.
In short: waiting to engage a geotechnical engineer usually costs more than it saves.
Benefits of Early Geotechnical Involvement
By involving a geotechnical engineer from the outset, developers and design teams gain several advantages:
1. Better Site Feasibility Decisions
A desktop study or preliminary site walkover can quickly highlight key risks — such as slope instability, fill, or challenging soils — that might influence the viability of a subdivision or infrastructure layout. This helps developers make smarter go/no-go decisions before committing major resources.
2. Efficient Concept and Detailed Design
With early soil and rock information, civil engineers and surveyors can design with confidence. Road grades, stormwater layouts, and earthworks volumes can all be optimised to suit the ground conditions.
3. Reduced Consenting Risk
Most councils in New Zealand, particularly Auckland Council, expect geotechnical input at subdivision and building consent stage. Having reports and recommendations ready early helps prevent costly RFIs and resubmissions.
4. Construction Certainty
Contractors prefer projects with reliable ground information. Early investigation reduces the risk of “nasty surprises” on site — helping with tender pricing, construction planning, and overall project delivery.

Examples from Local Projects
In Auckland and across New Zealand, we’ve seen real examples of both approaches:
Early involvement: A subdivision where we completed a geotechnical investigation during concept planning. The information allowed the civil design team to adjust earthworks to balance cuts and fills, minimising export of soil and reducing retaining wall heights. The project sailed through consenting with minimal council questions.
Late involvement: A retaining wall design where geotechnical assessment was only requested at the building consent stage. Our investigation revealed uncontrolled fill beneath the wall location. The design had to be changed, consents re-lodged, and construction delayed — all at significant cost.
These examples underline the value of getting geotechnical engineers involved from the start.
What Early Involvement Looks Like
Engaging a geotechnical engineer early doesn’t have to mean a full investigation from day one. A staged approach works best:
Desktop Study & Site Walkover – Quick, cost-effective identification of obvious risks.
Preliminary Investigation – Targeted boreholes, test pits, or CPTs to confirm key assumptions.
Detailed Investigation – Comprehensive ground model to support final design and consent submissions.
This staged process provides useful information at each project phase, allowing decisions to be made with increasing confidence.
Our Advice to Developers and Design Teams
If you’re planning a land development project, don’t treat geotechnical engineering as a box to tick at the end. Treat it as a foundation for smart, efficient design.
Bring us in early — even a quick desktop review can save major headaches later.
Work collaboratively — we integrate closely with civil engineers, surveyors, and planners to shape practical designs.
Think long-term — reliable geotechnical advice doesn’t just get you through consent; it ensures performance for decades.
Conclusion
The ground conditions beneath a site are one of the biggest factors influencing project cost, risk, and success. By engaging geotechnical engineers early, developers and design teams gain certainty, avoid costly redesigns, and deliver projects more smoothly.
At Gibb Ritchie Geotechnical Engineers, we specialise in working alongside civil engineers, surveyors, and developers from the concept stage. Our goal is simple: to help you de-risk your project and deliver it on time, on budget, and with confidence.
Planning a project? Talk to us early — we’ll help you get it right from the ground up.